Post-construction quality and depth provides improved onsite management of stormwater flow and water quality. It involves amending the disturbed soils with compost in the post development landscape to help reestablish a healthy soil ecosystem. This BMP is required for all sites.
This publication describes factors to consider when deciding to plant a hazelnut orchard and includes a table of native productivity ratings for soil series types in the Willamette Valley.