Post-construction quality and depth provides improved onsite management of stormwater flow and water quality. It involves amending the disturbed soils with compost in the post development landscape to help reestablish a healthy soil ecosystem. This BMP is required for all sites.
Laura Taylor works for the West Multnomah Soil and Water Conservation District. In this episode, find what happens when a local government wants to do something to help pollinator health. As a conservation technician and an ...
Forests produce economic benefits such as timber, forest products and jobs. They also provide wildlife habitat, recreation, carbon storage and clean water. In fact, most of Oregon’s drinking water is sourced from ...
An overview of mason bee basic biology and life cycle, and detailed descriptions of what is needed to start keeping mason bees, including desirable plants, nesting sites and types of nests, and caring for the ...
Brooke Edmunds, Richard Little, Ramesh Sagili |
Feb 2016 |
Extension Catalog publicationPeer reviewed (Orange level)
Pacific Northwest blueberry growers must identify and control a number of bacterial and fungal diseases in order to ensure the highest yields. Fortunately, only a few of the diseases that occur on highbush blueberry in this region cause significant losses when left unchecked.
Jay W. Pscheidt, Jerry Weiland |
Mar 2015 |
Article