Post-construction quality and depth provides improved onsite management of stormwater flow and water quality. It involves amending the disturbed soils with compost in the post development landscape to help reestablish a healthy soil ecosystem. This BMP is required for all sites.
Getting tree seedlings into the ground is simple: green side up, brown side down. The most important work comes beforehand with proper care and choosing a site that has lots of sunshine, good drainage and room to grow.
Forage quality of common pasture weeds was determined through laboratory testing to compare feed value of weeds to desirable forage species and nutrient requirements for grazing livestock.
Shelby Filley, Andy Hulting, Amy Peters |
May 2010 |
Article
Q: I have chopped down blackberry canes into fairly small pieces in my backyard. Can I leave them on the ground, or can these pieces of cane resprout? I'm not interested in using any kind of chemicals. If I dig up the ...